Installation:

There are currently a number of different installation system available in the market, examples are with Screwed-IN or with Adhesive Glued-IN installation methods.

However, our pioneer installation system, Hammer Locked-IN, is an revolutionized method which involves only a "Core Drilling" process and a Hammer to Lock the Tactile Studs into the ground flooring substrate.

This process provides a high frictional force between the Studs and the Flooring Materials.

With our team of installation experts, we are capable and guaranteed to provide a quick, less hassle and a clean on-site installation environments.

Here are some of our installation procedures check-list:

Drilling Tactile Tabling Tactile Installed on the Ground Flooring Surface

Advantages of our Pioneer Installation Technology:

Please feel free to contact us for the full installation consultancy.